toggle visibility
Search within Results:
Display Options:

Select All    Deselect All
 |   | 
Details
   print
  Records Links
Author Nyssen, J.; Fetene, F.; Dessie, M.; Alemayehu, G.; Sewnet, A.; Wassie, A.; Kibret, M.; Walraevens, K.; Derudder, B.; Nicolai, B.; Annys, S.; Tegegne, F.; Van Passel, S.; Frankl, A.; Verleyen, E.; Teklemariam, D.; Adgo, E. pdf  url
doi  openurl
  Title Persistence and changes in the peripheral Beles basin of Ethiopia Type A1 Journal article
  Year 2018 Publication Regional Environmental Change Abbreviated Journal Reg Environ Change  
  Volume 18 Issue 7 Pages 2089-2104  
  Keywords A1 Journal article; Economics; Engineering Management (ENM)  
  Abstract We have investigated the relevance of the notion of “peripheralism” in the Beles basin. In this lowland border area of Ethiopia, important investments require an evaluation of their socio-economic and ecological impacts in the light of Ethiopia's Climate-Resilient Green Economy (CRGE) strategy. We contrasted literature of different periods with field observations. In the middle and lower parts of the basin, the Gumuz people traditionally practised shifting cultivation. Resettlement of highlanders is particularly linked to water and land resources. A large irrigation project was initiated in the 1980s, but vegetables and fruits face post-harvest losses. Large water transfers from Lake Tana since 2010 affect the movement of people, the hydrogeomorphology, and ecology of the river. In several parts of the basin, the settlers' economy now dominates. Many Gumuz became sedentary but maintained their agricultural system, particularly in the south of the lower basin. Land titling allowed allocation of “vacant” areas to transnational or domestic investors. As a result, the semi-natural vegetation is frequently replaced by open cropland, leading to decreased carbon storage and increased soil erosion. This and water abstraction for irrigation jeopardise hydropower production, in contradiction with the CRGE objectives. Despite the recent developments, the contrasts in economic activity make the core-periphery dichotomy to remain actual in the Beles basin. The resettlements and permanent cropping tend to make the upper basin part of the core. However, the installation of a transit road and commercial farms in the lower basin do not allow to consider that a non-peripheral integration has taken place.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Wos 000445234600017 Publication Date 2018-04-28  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 1436-3798 ISBN Additional Links (up) UA library record; WoS full record; WoS citing articles  
  Impact Factor 2.919 Times cited 3 Open Access  
  Notes ; The authors acknowledge the numerous local inhabitants and authorities who shared their knowledge with us, particularly in Pawe and Dangur districts. All participants in group discussions and group excursions to the Beles basin are thanked for sharing ideas. The Institutional University Cooperation with Bahir Dar University (BDU-IUC), funded by the Belgian authorities, through the Flemish Interuniversity Council-University Development Cooperation, hosted the research activities. Lutgart Lenaerts (Norwegian University of Life Sciences) shared inspiring thoughts and Daniel Mege (Polish Academy of Sciences) provided useful documentation. Daniel Mege as well as Eric Movet (www.mydriase.fr) gave permission to use illustrations. The constructive comments on an earlier version of this paper by two anonymous reviewers and the editor are greatly acknowledged. ; Approved Most recent IF: 2.919  
  Call Number UA @ admin @ c:irua:154137 Serial 6235  
Permanent link to this record
 

 
Author Annys, S.; Adgo, E.; Ghebreyohannes, T.; Van Passel, S.; Dessein, J.; Nyssen, J. pdf  doi
openurl 
  Title Impacts of the hydropower-controlled Tana-Beles interbasin water transfer on downstream rural livelihoods (northwest Ethiopia) Type A1 Journal article
  Year 2019 Publication Journal Of Hydrology Abbreviated Journal J Hydrol  
  Volume 569 Issue 569 Pages 436-448  
  Keywords A1 Journal article; Economics; Engineering sciences. Technology; Engineering Management (ENM)  
  Abstract Despite public awareness of unintended impacts (1980s) and well-developed international standards (2000s), downstream impacts of large hydropower projects still very often are not properly assessed. Impacts of (hydropower-regulated) interbasin water transfers (IBWTs) are considered self-evidently positive, although they can have far-reaching consequences for hydrogeomorphological systems and consequently river-dependent communities. In this study, the downstream direct and indirect impacts of the Ethiopian hydropower-regulated Tana-Beles IBWT are evaluated in an interdisciplinary way. The components of the framework of rural livelihoods are considered and changing contexts, resources availabilities and livelihood strategies are analysed. Mixed methods are applied, combining hydrogeomorphological field observations, GIS analyses, scientific literature, policy documents, and semi-structured interviews with local people and local to federal authorities. Results show that the IBWT drastically increased the Beles rivers discharge (with an average release of +92 m3 s−1 at the outlet; *2 in rainy season and *12 in dry season 100 km downstream of the water release) and introduced dangerous situations for local communities (over 250 people drowned in the river). River bank erosion resulted in the uncompensated loss of farmland (163 ha) and the establishment of large-scale commercial farms increased the pressure on land and led to the impoverishment of displaced communities (4310 households). The project was implemented top-down, without any transparency, benefit sharing or compensation for external costs. This stresses the importance of downstream interdisciplinary impact assessments and highlights the need for decent in-depth ex post-analyses of hydropower projects. Environmental impact assessments should be taken seriously and cannot be considered a formality. In Ethiopia and in many developing countries, the hydropower industry is booming. Although dams and IBWTs can be the best solution for water-related problems in specific contexts, national development goals (such as the expansion of the electricity network) should not be at the expense of rural livelihoods.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Wos 000457952900032 Publication Date 2018-12-15  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0022-1694 ISBN Additional Links (up) UA library record; WoS full record; WoS citing articles  
  Impact Factor 3.483 Times cited 2 Open Access  
  Notes ; This study was funded by the Flemish Research Foundation (FWO, Belgium), through project No. G022217N and a specific travel grant for a long stay abroad (No. V445417N). We acknowledge the cooperation with the Bahir Dar University VLIR-UOS IUC programme. All support given by Bahir Dar University has been greatly appreciated and many thanks go to Yonnas Shawul and Deribew Fenetie, for assisting and translating in the field. Staff of various ranks in administrative offices are thanked for their cooperation and mostly openness during interviews. Special thanks go to the local farmers and other rural dwellers, for their cooperation and contribution to this research. We thank the two anonymous reviewers for their constructive comments. ; Approved Most recent IF: 3.483  
  Call Number UA @ admin @ c:irua:156935 Serial 6215  
Permanent link to this record
 

 
Author Zewdie, M.C.; Van Passel, S.; Moretti, M.; Annys, S.; Tenessa, D.B.; Ayele, Z.A.; Tsegaye, E.A.; Cools, J.; Minale, A.S.; Nyssen, J. url  doi
openurl 
  Title Pathways how irrigation water affects crop revenue of smallholder farmers in northwest Ethiopia: A mixed approach Type A1 Journal article
  Year 2020 Publication Agricultural Water Management Abbreviated Journal Agr Water Manage  
  Volume 233 Issue Pages 106101  
  Keywords A1 Journal article; Economics; Engineering sciences. Technology; Engineering Management (ENM); Sustainable Energy, Air and Water Technology (DuEL)  
  Abstract The relationship between irrigation water availability and crop revenue is multifaceted. However, most of the previous studies focused only on the direct effect of irrigation water on crop revenue or considered that the indirect effect passes only through the farmers’ improved farm inputs usage. Nevertheless, unlike previous studies, this study argues that a one-sided argument that irrigation water directly causes high crop revenue or indirectly affects crop revenue only via the farmers’ improved farm inputs usage is incomplete, as irrigation water not only directly contributes to crop revenue but also indirectly conduces to crop revenue via both the type of crops produced and the farmers’ improved farm inputs usage. Considering the previous studies’ limitations, this study investigates pathways how small-scale irrigation water affects crop revenue and identifies challenges of small-scale irrigation farming in Fogera district, Ethiopia. Results endorsed that irrigation water has both direct and indirect effects on crop revenue. The indirect effect is 67 percent of the total effect and it is mediated by both the type of crops produced and farmers’ improved farm inputs usage. The result also indicated that irrigation user farmers have a higher income, more livestock assets and resources and better food, housing, and cloths than the non-users. Moreover, challenges related to agricultural output and input market were identified as the most severe problem followed by crop disease. The findings of our study suggest that to utilize the benefits of irrigation water properly, it is crucial to encourage farmers to use more improved farm inputs and to shift from staple to cash crop production. Moreover, farmers are frequently exposed to cheating by illegal brokers in the output market, therefore it is also important to increase farmers’ accessibility to output and input markets, the quality of improved farm inputs, and the bargaining power of farmers with market information.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Wos 000525291200025 Publication Date 2020-02-29  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0378-3774 ISBN Additional Links (up) UA library record; WoS full record; WoS citing articles  
  Impact Factor 6.7 Times cited Open Access  
  Notes Bahir Dar University – Institutional University Cooperation; Approved Most recent IF: 6.7; 2020 IF: 2.848  
  Call Number ENM @ enm @c:irua:167592 Serial 6353  
Permanent link to this record
 

 
Author Annys, S.; Van Passel, S.; Dessein, J.; Ghebreyohannes, T.; Adgo, E.; Nyssen, J. pdf  doi
openurl 
  Title Small-scale irrigation expansion along the dam-regulated Tekeze River in Northern Ethiopia Type A1 Journal article
  Year 2020 Publication International Journal Of Water Resources Development Abbreviated Journal Int J Water Resour D  
  Volume Issue Pages 1-22  
  Keywords A1 Journal article; Engineering Management (ENM)  
  Abstract Based on extensive field information, farmer-led small-scale irrigation systems along the dam-regulated Tekeze River is investigated and the likelihood of future irrigation expansion within the area with modelled potential is discussed, considering facilitating and hampering factors. Due to dam-induced hydrologic alterations, downstream socio-ecological systems have strongly transformed as the irrigated area has quadrupled and the post-dam potential for perennial crop cultivation has attracted numerous migrant investors to the area, inducing inequalities but also providing opportunities. Future dam construction should involve tailored policy interventions to facilitate irrigation expansion, while safeguarding equal and sustainable access to water and land.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Wos 000569995600001 Publication Date 2020-09-16  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0790-0627 ISBN Additional Links (up) UA library record; WoS full record; WoS citing articles  
  Impact Factor 3.1 Times cited Open Access  
  Notes Approved Most recent IF: 3.1; 2020 IF: 2.088  
  Call Number UA @ admin @ c:irua:171952 Serial 6943  
Permanent link to this record
 

 
Author Annys, S.; Van Passel, S.; Dessein, J.; Adgo, E.; Nyssen, J. pdf  doi
openurl 
  Title From fast-track implementation to livelihood deterioration: The dam-based Ribb Irrigation and Drainage Project in Northwest Ethiopia Type A1 Journal article
  Year 2020 Publication Agricultural Systems Abbreviated Journal Agr Syst  
  Volume 184 Issue Pages 102909-102913  
  Keywords A1 Journal article; Engineering Management (ENM)  
  Abstract The 21st century revival of large-scale water resources development projects makes it important to keep assessing their impacts – preferably from an interdisciplinary perspective – in order to not repeat past mistakes and explore whether they could improve livelihood conditions for rural communities. In this study, costs and benefits of the World Bank-funded Ribb Irrigation and Drainage Project (RIDP) were investigated using a unique systems approach. The impact for farmers with different initial farming systems (rainfed – residual moisture – irrigated) was studied using field observations, document analyses, remote sensing, agronomic data and semi-structured interviews (n = 165). Data on project-induced changes to land and water availability, cropping patterns, farming systems and farm-level economics were collected. The results show that dam and dyke construction has reduced flooding, which has resulted in declining rice productivity ( – 42%) and concomitant shifts to lower value cropping systems. Results also reveal that the land redistribution has caused widespread livelihood deterioration as households had to give up 25% of their farmland and the communal grazing land was fully converted into farmland. Due to top-down implementation, nontransparent communication, delayed construction and lagging financial compensation, social resistance has appeared in the command area, impeding the construction works. In addition to these problems, if no rapid change to higher value crops can be realized, 20.5% of the farmers (those who already irrigate) will experience a loss of livelihood, 64.1% of the farmers (those with rainfed and residual moisture cultivation) will be on the verge of livelihood deterioration and only 13.5% of the farmers (those with solely rainfed cultivation) will enjoy RIDP-induced improved livelihoods. The fate of this project stresses the importance of investigating initial farming systems, exploring worthy project alternatives, improving participation, communication and benefit-sharing and strengthening the institutional capacity of implementing authorities.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Wos 000564756600013 Publication Date 2020-08-08  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0308-521x ISBN Additional Links (up) UA library record; WoS full record; WoS citing articles  
  Impact Factor 6.6 Times cited Open Access  
  Notes Approved Most recent IF: 6.6; 2020 IF: 2.571  
  Call Number UA @ admin @ c:irua:172030 Serial 6927  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: